Salher consolidates its presence in the Asian market with its latest hydrocarbon separation project
Salher’s new wastewater treatment project in Asia consists of a plant with seven hydrocarbon separators to treat large flows in an area close to the Red Sea.
Together with its local partner, the Chinese company SAAHOR, Salher has been part of the Red Sea Project for the preservation of the biodiversity of the area within a tourism project carried out by the company Greenism New Water Co, LTD. This recent collaboration with both companies represents the consolidation of Salher in the Asian market.
These seven Salher hydrocarbon separators include automatic skimmers in their ATEX version (with special protection for explosive atmospheres) and are custom-designed to separate oils and greases of a mineral nature and hydrocarbons from water, so that they adapt to the real needs of the client.
Salher: hydrocarbon separation expertise
Salher’s experience in designing and manufacturing hydrocarbon separators that meet the expected performance for more than 45 years is the main guarantee of confidence that allows the company to continue expanding throughout the world, while at the same time protecting water and ecosystems from polluting spills with its treatment systems.
If you want to know how these hydrocarbon separation systems work, click on the Play button of the following video:
Latest news
Latin America set sights on Salher’s water reuse solutions
Over the last year Latin America has shifted the balance towards sustainabily to protect its water resources and improve the region's quality of life. An increase in investment and the number of...
How do Salher water pretreatment systems protect your WWTP?
Screening systems, grit chambers and grease chambers are pretreatments that protect the electromechanical equipment of the water treatment lines. Salher designs and manufactures these types of...
Salher is committed to photovoltaic self-consumption
With a view to a more sustainable and economical approach, Salher has installed solar panels at its headquarters in Arganda del Rey, Madrid. The Spanish company's aim to develop its business in an...
Salher Products
Designed and developed to meet all the requirements in water treatments.
Services
Project and Design
Engineering development and projects management.
Manufacturing
Production of GFRP, polypropylene and steel equipment.
Assembly of modular equipment and integration in civil works.
Supply
Selection of equipment and instrumentation to provide an integral water treatment solution.
Commissioning
Technical assistance in the electromechanical and electrical assembly of every water treatment plant.
Maintenance
Post-installation control service by a qualified technical staff.
Courses & documentary support
Practical training and delivery of manuals of operation, commissioning and maintenance.
salher@salher.com
Carrera Toledana, 33. Arganda del Rey. Madrid 28500. Spain.
+34 91 870 00 15
Spain / +34 91 870 00 15
Poland / +48 22 737 24 95
Portugal / +351 234 795 821
Engineering – Wastewater treatment – Purification – Liquid/solids separation equipment for industrial and municipal process applications – Surface water – Groundwater – Water Reuse – Drinking Water – Hydrocarbon and Oil Water Separation